Update Group were engaged by Aecon Airport Constructors to provide the entire mechanical, electrical, IT and fire safety systems for the new passenger terminal at Bermuda’s international airport.

Project Profile

01
01

280,000 sq ft

In order to facilitate the increasing popularity of Bermuda as a destination, a public private partnership project between the Bermudian Government, Skyport and Aecon Group was initiated to construct this new 280,000 sq ft terminal.

02
02

250+

250+ workers on site at the peak of the project. 500K man-hours worked without any lost time injuries.

Our scope on the project included the entire mechanical, electrical, fire protection, IT and security systems.

Update Group worked closely with Aecon in the development of the design into the detailed and coordinated install which was ORAT-compliant (Operational Readiness and Testing).

Our scope also included the infrastructure packages for the MV network and storm drainage systems, as well as standby generation and full load UPS support.

Update Group is especially proud to be associated with a project that is creating something special for Bermuda and its people.

Technology

Within the overall IT systems we had responsibility for the Airport Information Management systems. This included the turnkey install of the flight and gate display systems, automated check-in kiosks, and all airline check-in desks.